Browse all practice questions for the Urban Search and Rescue (US&R) Structural Collapse Level 2 Advanced Sheet Practice Exam. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

Urban Search and Rescue (US&R) Structural Collapse Level 2 Advanced Sheet Practice Exam course image
More practice questions

These questions are part of the practice quiz. Start practicing

  • What is a primary objective of dewatering during a basement collapse?
  • When selecting lifting points for debris removal, what is the critical factor?
  • In concrete structures, shoring should start at least how many good floors below the damaged level?
  • What provides critical information about the structure's contents, informing victim condition and the protection needed for rescue personnel?
  • Lighting a torch produces toxic ____ and flammable ____, which pair completes the sentence?
  • Which option completes 'Risk lives to' in the risk guidelines?
  • What does three-point lighting entail in collapse operations?
  • Post-tensioned cables use greased strands; the strand count is seven.
  • Who should operate all heavy equipment?
  • How can you ensure accurate timekeeping and handoffs during operations?
  • Which option lists the three actions that safely mitigate a structural hazard?
  • Which of the following is a key collapse indicator that suggests progressive instability in a structure?
  • Which statement best explains why shores on different floors should be aligned above and below each other?
  • Foot protection requirements
  • Overhead _____ lines pose a great threat when operating a crane because power lines may be closer to the ground during structural collapse incident due to broke power poles or lowered building attachment points due to the collapse.
  • During breaching operations, which of the following is a hazard related to heat?
  • Normal settlement and shifting debris, vibrations, and aftershocks can cause previously accessible void spaces to become inaccessible.
  • What is the purpose of a stabilization plan and what should it include?
  • Which factor is used to estimate the weight of the object being lifted?
  • Which of the following is a common indicator that ventilation is needed in a collapsed structure?
  • In post-tensioned concrete, when is the steel tensioned?
  • Which term completes the sentence: Rescuers should avoid cribbing or _____ them closed?
  • Why are ratchet jacks dangerous?
  • Which of the following is NOT listed as a place where victims are likely to survive?
  • The acronym LACES stands for Lookouts, Awareness, Communications, Escape Routes, and Safe Zones.
  • The collapse _____ is how the building failed.
  • When documenting stabilization actions on scene, which information should be recorded?
  • How do angles of attachment affect sling loads?
  • In wood or lightweight steel frame structures, shoring should start at least how many floors below the damaged floor?
  • Precast construction parking facilities are generally how many stories tall?
  • How do you determine if a structure is safe to approach after stabilization?
  • What are the dangers of high-tension cables and heavy loads in collapse zones?
  • How can you prevent cribbing from sinking on soft soils or rubble?
  • Heavy Floor construction structures often fall down on themselves (pancake), or may fall laterally if the columns are strong enough.
  • OSHA 29 CFR 1910.269: What is the crane minimum clearance distance from power lines?
  • Emergency shoring must be designed like a _____ funnel. The systems are designed to _____ the load with a header or wall plate, _____ the load with posts, struts or rakers and to _____ the load to the supporting structure below or to the opposite side through a sole plate of wall plate over a wide area.
  • In precast construction, the principal failure is due to the weakness of the connectors used to connect building parts; the weak connectors fail which creates many falling hazards as precast sections break loose and become unstable.
  • How should utilities be managed at the scene to prevent energization or gas release?
  • When performing what type of triage do rescuers consider the structure type and likelihood of live victims?
  • Which factors influence the selection of cribbing components for stabilization operations?
  • What is the primary purpose of stabilization in relation to rescue operations?
  • What angle should your rigging be between the load and the crane?
  • What is the role of redundancy in load paths within cribbing or shoring systems?
  • A personnel accountability system must be in place to keep track of all team members at all times through their supervisor and, if staffing allows, assign a personnel accountability _____ to conduct or supervise this important function.
  • Which option correctly describes a basic stabilization plan component for a collapsed structure?
  • Which term describes temporarily supporting a damaged structure to prevent further movement during rescue?
  • The time of the day is a critical factor when combined with the occupancy type to help determine number of potential victims.
  • What is the value of conducting thorough scene documentation during stabilization?
  • What devices can detect sounds made by conscious victims buried deep within a collapsed structure?
  • Cribbing and lifting point selection should consider stability of the lifting points.
  • What is the lifting capacity of a lattice bottom crane?
  • The size of the structure and its construction type help determine the equipment needed to remove what material and debris?
  • Why is it important to avoid rapid or uncontrolled debris removal before stabilization?
  • Which factor is explicitly listed as a knowledge item about a structural collapse?
  • Which of the following would be least helpful in identifying potential collapse patterns before entry?
  • To prevent the Jack from sinking into the surface, what should you do?
  • What factor is essential when coordinating a multi-team response to a structural collapse?
  • The FEMA marking system labeling proceeds around the structure starting from the street side in which direction?
  • Before lifting, which elements should be included in the stabilization plan and verification process?
  • Which organization developed the building marking system?
  • How should electrical hazards be addressed at a collapse site?
  • How many victims will be rescued during the greatest survival window?
  • The five collapse patterns are generally associated with _____ construction but may be present in all types of construction.
  • What is the primary approach to balancing rescue priorities when live victims and structural stabilization are both at stake?
  • What are common limitations of airbag systems used in structural stabilization?
  • Describe a safe method for creating a stable working platform above a collapsed floor.
  • How much water should you drink during extended operations?
  • When is it appropriate to use air- or hydraulic-powered shores in stabilization?
  • What is the lifting capacity of a rough terrain crane?
  • What is the lifting capacity of a hydraulic crane?
  • What is the primary consideration when using a hydraulic jack?
  • What should be included in an after-action training recap following a collapse incident?
  • Which of the following is a factor you should know about a structural collapse?
  • Which area is listed as a potential survival area in a collapse?
  • Explain the concept of 'load path' in structural collapse stabilization.
  • What is the recommended approach to patient packaging in a collapsed structure?
  • Which is the correct expansion of the acronym LACES?
  • What equipment is used for patient packaging in a collapsed structure?
  • To limit fatigue and injury, you should work within the capabilities of the _____ and use the tool properly.
  • What is the purpose of using a '3-point' or 'three-person' technique in cribbing?
  • Which pair completes the statement: 'Douglas Fir and Southern Pine are the two most common species used in cribbing and shimming loads'?
  • In a ventilation management plan, what does equalizing pressure accomplish?
  • In what scenarios should you consider using mechanical advantage systems during debris removal?
  • What should be avoided to prevent electrocution when power cords are used?
  • Irregular objects require stable lifting points and cribbing due to their surface area contact and center of gravity considerations.
  • If a cervical spine injury is suspected during extraction, what packaging step should be taken?
  • Why include contingency steps in a stabilization plan?
  • Spontaneous rescuers present before the arrival of rescue personnel can be a significant resource if they are organized.
  • Which statement describes post-tensioned concrete?
  • How should gas detectors be used during a collapse operation?
  • Special high strength cables used in concrete post-tensioned slabs consist of a greased, _____ strand, _____ inch diameter wire enclosed in a plastic sheath that is cast into the concrete. Before or after the concrete is hardened (depending on whether the structural member is pre or post tensioned), the cable is tensioned to about 25000 lbs.
  • If exact weight is not readily available, what method is commonly used to estimate the load weight?
  • If high-tech devices are not available, drawing _____ lines over cracks and watching the lines move out of alignment or using an observer can assist with monitoring potential collapse.
  • Which crew-rotation arrangement minimizes simultaneous relief of hands-on rescuers?
  • What is a primary purpose of ventilation in a collapse scenario?
  • Perpendicular to the grain rating for the two common cribbing species is approximately?
  • Rebar provides concrete with which type of strength?
  • Possible reactive cutting forces when operating a chain saw
  • Which equipment is used to monitor atmospheric hazards at a collapse scene?
  • Why should you test a cribbed deck before standing on it?
  • What is a safe and effective approach to lighting a collapsed area for operations?
  • What is the primary purpose of an 'exit plan' in a collapse operation?
  • What voltage batteries can be used for an exothermic torch?
  • Which statement below correctly identifies one floor below the damaged level for shoring in wood or lightweight steel frame structures?
  • OSHA 29 CFR 1926.550: What must be ensured regarding power lines during crane operation?
  • When should stabilization occur relative to rescue operations?
  • What is the purpose of tag lines and rigging when lifting debris?
  • In post-tensioned concrete cables, the greased strand is seven-strand and the wire diameter is half-inch; the tensile force is about 25,000 lbs.
  • Rescue tools include hand tools, power tools, and what other category?
  • Emergency shoring sequence: the load is collected by a header or wall plate, supported by posts, struts or rakers, and distributed to the structure below or opposite side.
  • Why is it essential to maintain a stable stance and avoid overreaches during stabilization?
  • _____ shear off segments of concrete towards an open space. Continuous hammering of solid concrete at right angles in ineffective because the bit will get stuck in a small crevice as you attempt to fight the concrete with _____ which is its strongest property.
  • Which symbol indicates that all confirmed victims have been removed?
  • How often should you rotate teams during operations?
  • What is a potential consequence of failing to deconflict tasks among teams during a multi-team response?
  • What should a pre-lift check of rigging and lifting equipment include?
  • Which of the following is NOT a listed collapse pattern?
  • What components constitute a cribbing-based stabilization system?
  • What is the standard unit weight used for concrete in shoring calculations?
  • Before entering a space, how can potential collapse patterns be identified?
  • When selecting equipment for a task, what is essential to ensure safety?
  • During heavy equipment operations, which method is combined with voice communications to overcome noise?
  • What does a post-stabilization re-assessment typically involve?
  • Which construction category includes highway bridges?
  • What psi should the oxygen regulator be for an exothermic cutting torch?
  • Which structural category typically includes office, commercial, or industrial buildings and may include highway bridges?
  • Why is there a danger in over-stabilizing a collapse scene?
  • How often should you drink water during operations?
  • The principal failure due to weak connectors between floors, walls, and the roof, causing precast sections to break loose, is associated with which construction type?
  • Wedge anchors should be tightened with what tool?
  • The building marking system was developed by FEMA.
  • What is the role of the Incident Command System (ICS) in US&R Level II operations?
  • Chalk lines are used to monitor cracks because they provide a visible reference for movement.
  • In building triage, besides the type of structure, what factor must rescuers consider?
  • What practice helps reduce entrapment risk during debris removal?
  • Which factor is essential when selecting cribbing points for an unstable load?
  • How fast should you triage a building?
  • What is the purpose of establishing a safe operating zone during scene size-up?
  • Which description best fits triaging in collapse response?
  • During debris management around a void space, which removal approach is appropriate?
  • Which rescue approach is appropriate when victims are trapped in void spaces within a collapsed structure?
  • Which construction type is built off-site and then put in place?
  • The lean to, V shape, A- Frame, pancake and cantilever are all types of _____ patterns.
  • For multi-floor shoring, shores on different floors should be aligned in which relation to each other?
  • What portion of the crew should be replaced at one time to allow new workers to acclimate to the plan and tactics?
  • Which type of steel structures may be 2 to 100+ stories tall and include highway bridges?
  • What atmospheric hazards must be considered in a collapse scene, and how are they monitored?
  • What characteristics should anchor points have in stabilization operations?
  • Rescuers must understand the uses and limitations of heavy ______.
  • In stabilization planning, what is the purpose of load path assessment?
  • If the load is lifted to the right or left of the center of gravity, what will happen?
  • When documenting stabilization actions, why should observed results be included?
  • Which statement correctly describes pre-tensioned concrete?
  • Which of the following is NOT one of the four heavy construction types?
  • What symbol is used to indicate that all confirmed victims have been removed?
  • Underground parking garages and basements are examples of areas where victims may survive but have limited or no escape.
  • In rigging, which factor describes how lines attach to the load?
  • Which PPE items must be worn during stabilization and extrication work?
  • Structures that are heavy floor construction can be residential, commercial, or industrial, with concrete frames and may be up to twelve stories tall. This category includes highway bridges.
  • The compressive strength in psi for Douglas Fir and Southern Pine when perpendicular to the grain is what value?
  • Which are the main categories of cranes?
  • Which area should be monitored for fall hazards due to gravity?
  • Which action best supports ongoing stabilization during a lift if conditions change?
  • Which statement best describes the standard shoring weights used for design calculations?
  • Hazards such as aftershocks, secondary collapse, or secondary explosion may need to be mitigated at the scene prior to rescue operations.
  • Which practice helps prevent injuries during debris removal near sharp edges?
  • Emergency shores are primarily used to:
  • What is the critical angle for lifting loads?
  • What are the two primary types of stabilization systems used in US&R Level II operations?
  • Precast parking facilities are generally one to fourteen stories tall.
  • What is the primary concern during all emergency operations?
  • Cleaning or repairing assigned personnel protective equipment should be done according to whose recommendations?
  • In a basement collapse with potential water intrusion, which safety consideration should guide the use of electrical equipment?
  • Heavy wall construction buildings are one to eight stories in height and may be residential, commercial, industrial, or institutional, with heavy and thick walls and wooden or lightweight concrete floors.
  • Which option lists common cribbing configurations used to create stable platforms?
  • How can you verify that stabilization is effective before moving debris or rescuers?
  • What temperature does an oxygen acetylene cutting torch average at?
  • How should you handle evidence and victim remains to preserve chain of custody?
  • When cutting tensioned cables no more than _____ adjacent strands should be cut in each direction unless the structure has been collapsed and is being supported more or less uniformly. Within a building, an area within _____ feet each way of the centerline of the cable should be evacuated.
  • Which area is most likely to contain survivors in a collapse?
  • How should fatigue be managed during a long stabilization operation?
  • Which elements constitute a redundant safety approach in US&R stabilization?
  • Normal settlement and shifting debris, vibrations, and aftershocks can cause which type of collapse?
  • Where is the highest survival rate for trapped victims typically near?
  • How can you manage the risk of entrapment during debris removal?
  • How hot can an exothermic cutting torch operate at?
  • What is a recommended approach to plan for potential water ingress in a basement collapse?
  • Besides occupancy and the structure's condition, which information must be gathered?
  • Which are critical signs of secondary collapse risk?
  • Should you cut post tension cables?
  • When is the greatest chance of survival for trapped victims?
  • In breaching operations, which is a hazard related to moving loads?
  • Which factor is NOT typically considered when selecting cribbing components?
  • The evaluation of building integrity in collapse incidents is commonly referred to as what?
  • Which factors determine the amount and type of equipment needed to remove rubble?
  • Which arrangement best describes keeping new workers from being relieved at the same time while hands-on work continues?
  • Which property of concrete provides its primary resistance to being crushed under compression?
  • What practice helps maintain safety when working near high-tension hazards and heavy loads?
  • What is the greatest concern for rescuers during a structural collapse?
  • How many phases are generally involved in a structural collapse rescue?
  • What is the primary priority during scene size-up in a structural collapse incident?
  • Which set of noises can cause rescuer hearing damage?
Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy